top of page
Carrollton House Gallery
Carrollton House work: cut bar top down to counter height, removed all doors and drawer fronts, removed cabinet lift of refrigerator(then install 3 flooring shelves) removed cabinet above the refrigerator (install) then installed wine rack. Removed cabinet on back wall lift of pantry closet, then installed coffee bar with rain glass doors and shelves, removed pantry closet door, then painted all cabinets, then installed a deck of new cabinets on top of all upper cabinets with glass doors and glass shelves, then new installed shaker doors and drawer fronts on cabinets, new backsplash and quartz counter tops also on left wall coming in kitchen entrance we cut a hole in hallway hall then installed a broom closet.
bottom of page